The drying time of water based polyurethane.
Water based polyurethane for floors dry time.
What are the best brands of polyurethane for hardwood floors.
It takes oil based polyurethane 24 hours and water based polyurethane 6 hours to dry enough to be able to walk on it in socks and proceed to the next step of the application process sanding or applying the next coat.
We just had red oak hardwood floors installed in two rooms and the adjoining rooms were all sanded and refinished.
24 hrs before you can walk on the floors.
Oil based polyurethane floor finish.
The chart below shows the average dry time for different finishes dry time allows us to have access to the floors in between coats.
Water based finishes dry fast most within two hours so you can apply several coats in a day.
For purposes of this post this timeline is from the time the last coat of polyurethane is applied.
Oil vs water based polyurethane pros and cons.
Require less maintenance over time.
How many coats of polyurethane for hardwood floors.
Oil based polyurethane takes longer to dry than water based poly.
After just 6 hours following the application you can walk on the finished surface.
Don t confuse dry time with curing time which can take up to 1 month depending on conditions.
Our installer did an awesome job but he thinks i am crazy to want another.
48 hrs you can walk on it with shoes.
With water based finishes we can do 2 coats on the same day in some circumstances.
You should remember to have your socks on and not barefoot while walking over the surface.
In this time the floor should appear dry and not tacky at all.
Our installer applied three coats of oil based duraseal and i would like an additional coat.
And make sure your pets who usually have bare feet do not walk on the floors during this time.
For oil based poly it usually takes 30 days to.
With water based poly can save you several days in the drying time so that you can move in faster and paint faster.
Avoid shoes and bare feet.
The water based polyurethanes are the first drying ones.
Water based polyurethane a more recent development than the solvent based variety dries more quickly thus making single day floor finishing feasible.
Although it takes longer for a solvent based product to dry both water and solvent based products take several weeks to completely harden or cure.
That s how we can apply multiple coats in a few days.
Hours 24 48 you can walk on the floors with socks.
Please note that these times are estimates and times can vary especially based on humidity levels.